A great number of changes would come after the original plans were put in place. The "North Leg" of the freeway that originally cut through what is now Dupont Circle, U Street, and Truxton Circle, was changed to travel through a tunnel underneath K Street NW. An additional bridge crossing the Potomac River was also added to handle the increasing traffic, known as the Three Sisters Bridge.
Most of the proposed routes explored at some point